본문 바로가기

카테고리 없음

Borang Tuntutan Skim Takaful Pelajar Sekolah Malaysia

Borang Tuntutan Skim Takaful Pelajar Sekolah Malaysia

BORANG CADANGAN BAGI SKIM TAKAFUL KONTRAKTOR SEMUA RISIKO PROPOSAL FORM FOR CONTRACTORS ALL RISK TAKAFUL PERHATIAN: DENGAN INI ADALAH DIKEHENDAKI MENERANGKAN DENGAN SEPENUHNYA DAN SEBENARNYA BUTIR-BUTIR YANG ANDA TAHU SEPATUTNYA TAHU DALAM BORANG CADANGAN INI, JIKA TIDAK SIJIL YANG DIKELUARKAN MENURUT CADANGAN INI ADALAH TIDAK SAH. NOTE: YOU ARE TO DISCLOSE IN THIS PROPOSAL FORM, FULLY AND FAITHFULLY, ALL THE FACTS WHICH YOU KNOW OR OUGHT TO KNOW, OTHERWISE THE CRTIFICATE ISSUED HERUNDER MAY BE VOID. THE PROPOSER a) Name & Address of the Principal Trade or business b) i) Name & Address of the Contractor Trade or business ii) Company Registration No. A) i) Name & Address of the Sub Cont-tractor, if any, Trade or Business ii) Company Registration No.

Sekolah kerajaan dan sekolah bantuan kerajaan, sekolah-sekolah negeri perak. Tuan, pelaksanaan skim takaful pelajar sekolah malaysia (tpsm) bagi murid prasekolah, sekolah rendah, sekolah menengah dan tingkatan enam kementerian pendidikan malaysia 2018. Dengan segala hormatnya merujuk perkara di atas. Cara Buat Tuntutan Skim Khairat Kematian BSH 2019 (SKK Bantuan Sara Hidup), Prosedur Tuntutan Skim Khairat Kematian bsh dahulunya BR1M 2019 di cawangan bsn beserta dokumen yang diperlukan oleh waris untuk menuntut wang. Pelaksanaan skim takaful pelajar sekolah malaysia (tpsm) bagi murid prasekolah,sekolah rendah,sekolah menengah dan tingkatan enam kpm 2018 Surat pelaksanaan TPSM 2018 dari JPN.pdf SKIM TAKAFUL (1).pdf.

B) Telephone/Fax/E-mail / / c) Whose Interests are to be insured? D) Past experience of the Contractor (provide list of major contract with contract details) e) Claim history for the past 5 years (please provide details) 2. THE CONTRACT WORKS a) Full description of the Contract/ Contract Title b) Please give details i. Building (type of construction, number of storeys/Basement etc.) ii. Blasting operation iii.

Excavation work iv. Pile type/dimension/depth v. Tunneling vi. Dam Construction or diversion of water vii. Others (Specify) Note - A site plan of contract works to be enclosed. Contractor Sub-Contractor Principal c) i) Is this a Contract/Sub-contract forming part of an overall construction project ii) If yes, give name of the Project d) i) Will the construction be carried out by your own personnel? Ii) If not, by whom?

Borang tuntutan skim takaful pelajar sekolah malaysia india

E) i) Will any sub-contractors be taking part in the work of construction? Ii) if yes, what is their position as regards to this Takaful iii) Past experience of the Sub-Contractor (provide list of major contract with contract details) 3. THE CONTRACT SITE a) Location of Contract site a) b) Nearest port and/or Railway Station and distance. B) Note - A complete lay out of the site may be enclosed c) Are any one or more of the following perils/risks likely to be involved? C) i) Earthquake-Fire & Shock ii) Landslide/Rockslide/ Subsidence iii) Flood/Inundation iv) Storm/Tempest/Hurricane/Typhoon/ Cyclone v) Collapse vi) Water Damage for Wet risk i.e. Contract involving construction in rivers, canals, lakes or sea. D) Distance from nearest river, lake, reservoir or sea - the names and particulars to be given d) e) Elevation of construction site above normal river, lake, reservoir or sea level e) f) Is there any record of the construction site ever having been affected by any of the major perils specified in (c) above?

Borang Tuntutan Skim Takaful Pelajar Sekolah Malaysia Online

F) Yes No Yes No Yes No g) Give full details regarding geological condition including sub soil g) h) Brief description of the arrangements made for storage of construction materials and equipments - whether in open or closed premises. H) i) i) Will there be a watch and ward round the clock? I) ii) If not, what precautions will be taken against theft, malicious damage etc.

Borang Tuntutan Skim Takaful Pelajar Sekolah Malaysia